Launch Log
Engineering milestones, design decisions, and production progress — documented as they happen.
- 01Design
Design-System Contract Finalized
The AXIS design-system contract is locked. Thirty-one real images verified, full token inventory published, shared-element View Transitions wired, and the foundation handed off to section builders. Every downstream page composes from the same instrument vocabulary.
Read update
- 02Engineering
Scroll-Scrubbed Video Hero — Complete
The HUD video hero is verified in production: frame-accurate scrub at 59.94fps, spec counters that snap-lock at scroll checkpoints, a variable-font model name that morphs weight and width as it settles, and a zero-console-error Playwright confirmation.
Read update
- 03Milestone
Project Announced
AXIS enters production. The engineered cinematic launch platform is underway — six pages, one signature scroll-video hero, and a precision instrument aesthetic built from the ground up.
Read update