UPDATES03 ENTRIES

Launch Log

Engineering milestones, design decisions, and production progress — documented as they happen.

  1. 01
    Design

    Design-System Contract Finalized

    The AXIS design-system contract is locked. Thirty-one real images verified, full token inventory published, shared-element View Transitions wired, and the foundation handed off to section builders. Every downstream page composes from the same instrument vocabulary.

    Read update
  2. 02
    Engineering

    Scroll-Scrubbed Video Hero — Complete

    The HUD video hero is verified in production: frame-accurate scrub at 59.94fps, spec counters that snap-lock at scroll checkpoints, a variable-font model name that morphs weight and width as it settles, and a zero-console-error Playwright confirmation.

    Read update
  3. 03
    Milestone

    Project Announced

    AXIS enters production. The engineered cinematic launch platform is underway — six pages, one signature scroll-video hero, and a precision instrument aesthetic built from the ground up.

    Read update