A working floor on the waterline
Kai Offices
A working floor on the waterline
+1.200 m
WORKPLACE BERGEN, NO 2023
03 / commercial
An adaptive reuse of a quayside warehouse into flexible studio offices, holding the original structural datum while inserting a new measured core.
+1.200 mBERGEN, NO2023
Datum sheet
03- Type
- Workplace
- Area
- 3 400 m²
- Status
- Completed 2023
- Datum
- +1.200 m
Walkthrough
Kai Offices
SCROLL
01 / 03
Quay

The retained brick face.
↔ 24 000 mm02 / 03
Atrium

A cut to bring light down.
↕ 9 600 mm03 / 03
Studio

Tables on the old grid.
↔ 11 200 mmEnd of section
Drawn, then built.
All projectsMaterial palette
One datum of matter.
- M.01Retained brickThe original quay face, repointed.
- M.02Exposed steelThe inserted frame on the old grid.
- M.03Polished screedA working floor at the waterline.
- M.04Smoked glassPartitions kept to the datum line.
Next project
04 / interiorsLysning Interiors
OSLO, NOVIEW CASE STUDY
