Meridian Bridge
Infrastructure

Meridian Bridge

The longest cable-stayed bridge in the Western Hemisphere. 4,200 feet of primary span crossing the bay with seismic base-isolation engineering rated for 8.0+ magnitude events.

Client Pacific Holdings
Location San Francisco, CA
Year 2023
Value $2.1B

The Meridian Bridge represents the pinnacle of modern cable-stayed bridge engineering. Spanning 4,200 feet across the bay, it connects two metropolitan areas that were previously separated by a 45-minute ferry crossing.

Engineering Highlights

  • Primary span: 4,200 ft cable-stayed
  • Seismic rating: 8.0+ magnitude
  • Foundation depth: 240 ft below sea level
  • Construction duration: 38 months
  • Peak workforce: 2,800 workers

The base-isolation system, developed in partnership with IRONFORGE structural engineering division, allows the deck to move independently of the towers during seismic events - a breakthrough that has since been adopted by infrastructure projects worldwide.